QQDEV · ASTANA · KAZAKHSTAN
QQDev Blog
We look at issues that should be resolved before starting a project: cost, preparation, checking the result.

Email is connected to CRM. Who can now see customer messages?
Check conversation access before connecting a work mailbox, and do not assess message visibility only through an administrator account.
3 min26 · Read →
There is an Export button. Can that file actually move you to another CRM?
Check export contents, record relationships, attachments and history before choosing a new system. Rows in a file do not mean a migration is ready.
3 min26 · Read →
CRM and a separate task manager: working together without double entry
When to retain two tools and what to hand over from sales to delivery: the outcome, owner and acceptance confirmation.
3 min26 · Read →
Do not demonstrate every button: teaching a team its first business system
Train by role and real actions: define what employees should be able to do afterwards and check whether the instructions help.
3 min26 · Read →
A file called “Document”: agreeing names without writing a novel
Simple naming rules for documents, folders and language versions. Test whether a colleague can find a file without help from its author.
3 min26 · Read →
Final, final-2, definitely-final: finding the working document version
A shared location, a clear owner and checked permissions help stop teams assembling the final file from scattered messages.
3 min14 · Read →
The automatic reply was instant. When did the customer actually get an answer?
Measure the first meaningful response without confusing it with a receipt notification or an unsuccessful call attempt.
3 min16 · Read →
“Nothing works”: how to describe a problem someone can actually investigate
Five ingredients for a useful support request: steps, expectations, actual outcome, timing and a safe example.
3 min17 · Read →
Everything is “in progress”, little is finished: easing a Bitrix24 task kanban
A board reveals the queue but creates no extra hands. Agree how much work may be started and how to resolve blockers.
3 min16 · Read →
Every box is ticked, but the result is not accepted: writing useful Bitrix24 checklists
Separate a list of actions from acceptance criteria and check whether a task has actually produced the required result.
3 min17 · Read →
