Discuss a project

QQDEV · ASTANA · KAZAKHSTAN

CRM list or kanban: which view fits your review?

Choose a view for the manager’s question: stage progression and field comparison need different perspectives.

Published

3 min10

A hypothetical example. A manager asks which requests lack an owner for clarification. A colleague presents a tidy board with cards arranged by stage. It looks organised but does not yet answer the question. The shop window is neat; the necessary label is inside the box.

In CRM, a customer relationship management system, choose the view to fit the task. Kanban arranges cards by stage; a list helps compare selected fields in rows. The official guide explains these options using leads, or initial enquiries. Lead viewing modes.

Start with the board to review stage progression

For “where has work stopped?”, first examine the distribution by stage. Then open a few records and establish the reason: waiting for the customer, internal approval or an unfinished result. A column position alone does not explain the cause.

Do not change stages to make the review look tidy. Moving a record can be a work action with consequences, including configured automation. Use training records to learn its behaviour and rely on confirmed conditions in live work.

Configure a table to compare fields

When values must be compared, choose a list and retain necessary fields. These might include the title, owner, stage and your review field. Agree what an empty value means: missing information, not yet checked or inapplicable to this request. Each calls for a different next action.

Do not display dozens of columns for future use. Start with the question and the minimum evidence needed to answer it. If information exists only in comments, changing the view does not turn it into a structured field. First agree where that information should live.

Compare the same selection

Before concluding that a deal disappeared from the list, check the CRM section, pipeline, filters and employee permissions. Record the review conditions and find a known training record. Two screens with different conditions need not show the same items.

For teams in Kazakhstan and Kyrgyzstan, agree stage names and field meanings in the working languages. Translating a label must not change the review criterion. If employees use different views, agree which question each answers and with what evidence.

Test the choice with one work question

Ask a colleague to find records needing clarification and show the basis for each selection. Record where the board was sufficient and where rows or an open record were needed. Check available fields, views and settings in your own portal and plan; do not promise one universal screen for everyone.

Next, retain a clear review procedure and train colleagues to use it. Discuss the manager’s question, field structure and views with QQDev as part of Bitrix24 implementation and configuration. Discuss a work review with QQDev.

← All blog posts